NYC's Steel, Elevator & Window Specialists — 4 to 20 Floor Buildings

646-479-0838
CORE SERVICE

STRUCTURAL
STEEL

Complete structural steel packages for mid-rise buildings — shop drawings, fabrication, erection, metal deck, and DOB permits — all under one roof at our Ozone Park facility.

Steel erection
Steel frame
Metal deck
200+
Projects Completed
4–20
Floors Served
5
NYC Boroughs
15K+
Tons Fabricated
WHY WE DO THIS

BUILT FROM THE
GROUND UP

Golden Storm was founded by ironworkers who spent years on NYC job sites watching structural steel projects fail — not because of bad steel, but because of fragmented teams. The fabricator didn't talk to the erector. The erector didn't talk to the engineer. The result was delays, change orders, and cost overruns that hurt everyone on the project.

We built Golden Storm to fix that. By keeping shop drawings, fabrication, and erection under one roof at our Ozone Park facility, we eliminate the coordination gaps that cost time and money. Every project has a single point of contact from the first drawing to the final inspection.

We specialize in the mid-rise range — 4 to 20 floors — because that's where NYC builds the most and where the coordination challenges are greatest. Residential towers, mixed-use developments, commercial buildings: we've done them all, in every borough.

Jobsite
Jobsite
Jobsite
Jobsite
WHAT'S INCLUDED

FULL SCOPE OF WORK

Shop Drawings & Engineering

  • Full connection design and detailing packages
  • Anchor bolt plans and column base details
  • Erection drawings and sequencing plans
  • Coordination with MEP penetration requirements
  • NYC DOB submission and approval tracking
  • RFI management and field change documentation

Steel Fabrication

  • W-shape columns and beams (all sizes)
  • HSS tube columns and braces
  • Custom connection plates and gussets
  • Moment connections and shear tabs
  • Transfer girders and long-span beams
  • Staircase stringers and landing frames

Steel Erection

  • Crane coordination and lift planning
  • Certified ironworker crews (union and non-union)
  • Temporary bracing and shoring
  • High-strength bolt installation and inspection
  • Field welding and touch-up
  • Plumbing, alignment, and final survey

Metal Deck Systems

  • Composite and non-composite deck supply
  • Shear stud welding (AWS D1.1 certified)
  • Edge angle and closure piece installation
  • Deck fastening and side-lap attachment
  • Coordination with concrete topping pour
  • Special inspection compliance documentation

Moment & Braced Frames

  • Fully restrained moment connections (SMF)
  • Partially restrained moment connections
  • Concentrically braced frame (CBF) systems
  • Eccentrically braced frame (EBF) systems
  • Buckling-restrained brace (BRB) installation
  • Seismic and wind lateral system coordination

DOB Permits & Inspections

  • NYC DOB permit filing and tracking
  • Special Inspection program coordination
  • Progress inspection scheduling
  • TR1 and TR8 form management
  • DOB violation response and resolution
  • Certificate of Occupancy support
HOW WE WORK

OUR PROCESS

01

Structural Review & Shop Drawings

We begin by reviewing your structural engineer's drawings in detail. Our in-house engineering team prepares a complete shop drawing package — connection details, anchor bolt plans, erection sequences — and coordinates with the engineer of record before a single piece of steel is cut.

02

Fabrication at Our Ozone Park Shop

All structural steel is fabricated at our own facility at 104-11 101st Street, Ozone Park. We use CNC plasma cutting, press brake forming, and AWS-certified welding. Every component is tagged and traceable from mill certificate to finished piece.

03

Site Mobilization & Erection

Our certified ironworker crews mobilize with all required equipment. We coordinate crane picks, manage temporary bracing, install high-strength bolts, and perform field welding. We maintain a perfect lost-time safety record across every project.

04

Metal Deck & Composite Systems

Following steel erection, we supply and install composite metal deck floor systems including shear stud welding and coordination with the concrete subcontractor. Our deck installations are designed to optimize composite action between deck and frame.

05

Special Inspections & DOB Closeout

We coordinate the full Special Inspection program — scheduling progress inspections, managing TR1 and TR8 forms, and resolving any DOB comments. We stay on the project through final sign-off and Certificate of Occupancy.

Steel process
Fabrication
Erection
TECHNICAL DETAILS

SPECS & STANDARDS

Building Range
4 to 20 Floors
Service Area
All 5 NYC Boroughs
Fabrication Shop
104-11 101st St, Ozone Park
Steel Grades
A36, A572 Gr.50, A992, A500
Welding Certification
AWS D1.1 Structural Welding
Bolt Standards
AISC / RCSC High-Strength
Deck Types
Composite, Non-Composite, Form Deck
Lateral Systems
SMF, CBF, EBF, BRB
DOB Filings
TR1, TR8, Special Inspection Program
Typical Lead Time
4–8 Weeks Shop Drawing to Delivery
WHY GOLDEN STORM

THE DIFFERENCE

One Contractor, Full Scope
Shop drawings, fabrication, erection, and deck — all from one team. No finger-pointing between subs, no coordination gaps.
Own Shop in Ozone Park
We fabricate in-house at 104-11 101st Street. No outsourcing, no markup on fabrication, full quality control from start to finish.
Mid-Rise Specialists
We focus exclusively on 4 to 20-floor buildings. This is our sweet spot — we know the challenges, the details, and the NYC DOB process cold.
48-Hour Quote Turnaround
Send us your structural drawings and we'll respond with a preliminary scope and budget range within 48 hours. No waiting weeks for a number.
Perfect Safety Record
Zero lost-time incidents across all projects. Safety is not a checkbox — it's how we run every job site, every day.
FROM OUR JOBSITES
Jobsite 1
Jobsite 2
Jobsite 3
Jobsite 4
Jobsite 5
Jobsite 6
Jobsite 7
Jobsite 8
VIEW FULL GALLERY
Completed project
12 FLOORS
Queens Mixed-Use
SUCCESS STORY

QUEENS
MIXED-USE TOWER

A 12-story mixed-use development in Flushing, Queens required a complete structural steel package on a compressed 18-month schedule. The developer needed shop drawings, fabrication, erection, and metal deck — all from a single contractor who could guarantee coordination between the trades.

Golden Storm delivered the complete package — 850 tons of structural steel, composite metal deck on all 12 floors, and full NYC DOB Special Inspection compliance — two weeks ahead of the original schedule. The project is now fully occupied with 180 residential units and 12,000 SF of ground-floor retail.

850T
Steel Fabricated
2 wks
Ahead of Schedule
12 Flr
Building Height

"Golden Storm gave us one contract, one schedule, and one point of contact. They delivered the steel, the deck, and the DOB sign-off on time. That's rare in this city."

Michael Tran — Developer, Flushing Queens
READY TO START?

DISCUSS YOUR
STEEL PROJECT

Send us your structural drawings or just a project description and we'll respond with a preliminary scope and budget range within 48 hours.